Caterpillar 14L 6×6 AWD grader available for rent — see the specs
+971 55 565 7355+971 56 929 1959[email protected]Sun–Fri · 7 am – 7 pmالعربية
Request a quote

ICAD 3 and Hameem Bridge Heavy-Transport Route

ICAD 3 and Hameem Bridge Heavy-Transport Route
Location
ICAD 3 and near Hameem Bridge, Abu Dhabi
Type of work
Road formation and U-turns

Road formation and a U-turn for the passage of loads of about 600 tons.

Scope of work

  • Debris, standing water and soil cleared from the road surface, then graded, watered and compacted to 95% MDD.
  • Gatch supplied, spread, watered and compacted in 25 cm layers to 100% MDD.
  • U-turn built near Hameem Bridge by removing the roadside rails and refixing them to Abu Dhabi Municipality specifications.
  • Steel gates with concrete foundations at Qusewirah dismantled and reinstalled to Musanada specifications.

Site photos

ICAD 3 and Hameem Bridge Heavy-Transport RouteICAD 3 and Hameem Bridge Heavy-Transport RouteICAD 3 and Hameem Bridge Heavy-Transport RouteICAD 3 and Hameem Bridge Heavy-Transport RouteICAD 3 and Hameem Bridge Heavy-Transport RouteICAD 3 and Hameem Bridge Heavy-Transport RouteICAD 3 and Hameem Bridge Heavy-Transport Route

More projects

Kizad, Abu Dhabi

Kizad Heavy-Load Parking

Parking built to carry loads of up to 1,000 tons, from formation level to base course.

Send
WhatsApp