Kizad, Abu Dhabi
Kizad Heavy-Load Parking
Parking built to carry loads of up to 1,000 tons, from formation level to base course.

Excavation, backfill, local roads and infrastructure for a residential villa project.



Parking built to carry loads of up to 1,000 tons, from formation level to base course.
Road formation and a U-turn for the passage of loads of about 600 tons.
Road widened and maintained for loads of up to 300 tons.